Friday, January 6, 2012

No-Name as of 1/6/12

A quick photo tour of the No-Name Industrial in it's current state (1/6/12).  First, for reference, here's the trackplan again.



No-Name Trackplan

We'll start at the right end of the plan at the Interchange and move along the layout to the diagonally opposite corner.  The first photo shows the interchange track with 4 cars on it.  To the left of the interchange track is a storage track used for Northeast Container, with nothing on it in the photo.  To the right of the interchange track is Northeast Container.  The cardboard box represents the dock where scrap is loaded into empty boxcars.  There should be a building just past the box to represent the warehouse, with the track the three boxcars in the corner are on disappearing into the building.  The roof in the foreground is mockup of the Midstate Recovery building.

Interchange and Northeast Container

The second photo shows Midstate Recovery.  The building is long enough to completely contain 2 bathtub gons repurposed to C&D debris service, with 1 car's worth of track on the far side of the building and space for 3 or 4 on the lead side of the building.  In the corner by the breaker box is the storage track used for Tighe, there's a single boxcar sitting on it in the photo.  Just past the storage track switch is the runaround switch.  The track heading off the left edge of the photo is the Northeast Container track.  Around the corner on the right edge of the photo you can see a bit of a tank car on the Cains siding.  All the track in the first two photos is code 125 on wood ties, the switches are Old Pullman kits and the rest is hand laid.

Midstate

Looking at the same corner from the other leg of the layout.  The boxcar against the far wall is the same one on the storage track you can see in the second photo.  On the aisle side is the Cains siding with 5 vegetable oil tanks on it.  The next track in is the runaround, then the main track which continues off where the MP-15 at the front edge of the photo is sitting.  The track with the gray plastic pellet covered hoppers on it is the transload track.  And the track at the far right with part of a boxcar visible is the Tighe track.  All the track in the second two photos is Atlas flextrack and switches.

Cains and the runaround

The final photo is taken standing in front of Cains looking at Tighe.  The aisle side track with the MP-15 on it is the main track.  There will eventually be some scenic excuse for it terminating at the wall, I haven't quite made up my mind what that will be yet.  The middle track with the gray cars on it is the transload track.  There's plenty of space between it and the main track for a gravel area for pneumatic trucks to suck pellets out of the railcars.  The large building mockup against the wall at the left is Tighe.  It's a foam core base with a couple sticks of wood here and there to stiffen it a bit, and some printouts of a photoshoped view of a building I photographed.  Not nearly as well done as Lance Mindheims photo buildings, but it's better than raw white foam core.  The "awnings" over the doors are sticky notes with a fold below the sticky line and with door numbers written on them.

Tighe and the transload track
That pretty much shows the current state of the No-Name Industrial Park layout.  Good enough to enjoy operating on, but lots of room for improvement.

Thursday, January 5, 2012

No-Name Construction

This post collects some progress photos of the No-Name Industrial construction.  Of course it wasn't always the No-Name Industrial (see the evolution post), and there were several changes to not only the plan but already constructed stuff as well.  Photos of the current state of the railroad are in a following post.

Construction started in the corner now occupied by Northeast Container.

1. 4/7/99 First section of backdrop.

2. 12/31/01 First benchwork, shelf brackets

The removable section in the corner between Midstate Recovery Systems and Cains is based on a piece of 3/4 inch plywood which slides into wood channels on each side.  There are hard stops at the back, and toggle clamps underneath to hold it so the rails are precisely aligned.
4. 2/26/02 The removable section.

In this overview of freshly glued down ties, you can see the ties for the second siding next to what is now the Midstate Recovery siding - that second siding never got as far as rail.

5. 5/24/02 A lot of ties glued down.

I use insulation displacement connectors, which are very reliable if you use them only on the type and size of wire they're rated for. The heavy red and black wires are my #10 track bus. The smaller red and black are #18 track feeders. The orange and brown pair were going to be the #12 accessory bus, current plan is they will be a separate power bus heading from my command station (which is on a shelf under Cains) to the N scale layout.  At the time I choose the wire, it still wasn't clear that I wouldn't end up running older O scale equipment that drew a lot of current, which is why I choose the heavier wire.

6. 3/8/03 Wiring.

Building the second leg of the layout.  This view looks from Cains down toward the corner with Tighe and the transload track.

7. 9/16/04 More bench work.

I got impatient and reused a bit of old plywood with homasote glued to it for sub roadbed for the main track behind Cains.  That made it harder to tie into the preferred 3/4 ply sub roadbed.  The second problem is the sub roadbed was positioned for the Elmira Industrial plan, and the Corning Industrial plan needed it in a slightly different place, so I had to remove about 4 feet of it.  The plastic tube coming out of the plywood and curving into the wall is for feeding the cab bus through into the ceiling and on to the radio base station.

8. 9/16/04 Adjusting roadbed to the new plan.

When I did both the Elmira and Corning Industrial plans, I had access to a large format printer with the caveat that I bring my own paper.  So I could print the plan out on 3'x4' paper sheets full size.  Taping in place and running over the lines with a pounce wheel made it easy to transfer the plan to the plywood.  The track closest to the aisle is the Cain's siding, which will be cookie cuttered to allow lowering it an inch.


9. 10/17/04 Transferring plan to plywood.

Here's the Cains siding cookie cuttered out and lowered 7/8 inch. If you look really closely at the sub roadbed just where it separates from the main plywood, and again two risers closer to the foreground, you'll see I had to route the thickness of the plywood down to 1/2 inch for a foot or so to make the two vertical curves fall where I wanted them to. In the background you can see the sub roadbed for what was the Wegman's siding on the Corning Industrial plan (now the Tighe siding), elevated 1/2 inch with a strip of 1/2 inch plywood. I used a belt sander to get a nice long taper on the end, and the curve around the back corner is a series of short pieces with shallow angles on the ends which make the curve when put together.

10. 11/19/04 Cains siding cookie cuttered.

The homabed at the yard throat. Lots of cutting and fitting. The little dots are all the brads sticking up that I used to hold it in place while the glue dried - they'll be pulled out later.

11. 11/20/04 The homabed at the Corning Industrial yard throat.

Sanding the homabed can be tedious.  I got impatient this time and did it with the belt sander. Works quite well with relatively fine sand paper, a vacuum attached to control the dust, a bubble level stuck to the top (that round white thing), and some restraint. The odd thing in the upper left is a belt cleaning tool - it unclogs the sandpaper, and unclogged sandpaper makes everything go faster. You do need to be careful, and not press at all but just let the weight of the sander to the work while you worry about keeping it level and moving so you don't make dips and wobbles. It's way faster than the long piece of sandpaper on a 2x4 approach I used before.

12. 12/4/04 Sanding the homabed.

The original part of the layout is handlaid code 125 rail on wooden ties. The new part is Atlas code 148 flextrack. Needless to say, they're not the same overall height. It took some time and a lot of trial and error to get the homabed tapered down just enough to line up the rail head. The damage to the paint on the old rail is from the rail bender. It's not really noticeable from a normal viewing angle, but I'll touch it up one of these days. The speckly paint on the flex track is from a painting experiment that didn't go quite so well.

13. 12/4/04 Tricky alignment job.

I primed the homabed (and everything nearby) to seal it. I had white primer on hand, so that's what I used.  Gray would have been a better choice.  Pretty much every switch in this picture had to have a bit trimmed off at least one leg.

14. 12/13/04 Laying Atlas flex track and switches
That second siding I pointed out the ties for in photo 5 above meets it's demise.  The remaining siding was Cornell Brothers Agway on the Corning Industrial plan, and is now Northeast Container on the No-Name plan.  The jog visible in the distance was originally justified by the second track, I'm figuring out how to place buildings so as to make it visually "obvious" why the track jogs.

15. 2/13/05 Tearing out the ties for the second siding.
In the Elmira Industrial plan, the access hole in the corner was inside a building. In the Corning Industrial plan, it had the Cornell Brothers Agway track extending over it.  So I made a removable hatch to cover the hole.  The hatch registers against the near side of the hole, and in the back in the corner there's a cleat with a couple springs pushing against the hatch to keep it from wiggling around.  The screw eye near the front edge will be hidden by bushes. It's a handle to make it easy to lift the front edge, get a hand under it, and lift the whole thing out.  Since the end of the spur is going to be completely weed covered I didn't bother with homabed, ties, or ballast. That's just 1/2 inch homosote with rail spiked directly to it. The whole mess is sealed with gray paint. The track on the hatch is unpowered, since only a little over a car length of track is on the hatch there's no reason for a loco to ever get down there.

16. 8/5/05 Access hatch.

17. Screen wire for scenery at Cains.

The plans at one point called for a curved switch leading out onto a second peninsula covered with industry.  It seemed like a good idea to see if I could actually build a curved switch that worked before proceeding, so I did.  I drew up the centerlines in cad, printed out a full sized plan and glued it to a piece of 1/8" plywood.  I glued PC board ties to that, and after a lot of rail bending, filing, fitting, and soldering I had a turnout that worked pretty well.  And then I changed the plan to not need it.

18. 1/10/06 Curved switch done and works.

Not shown in this series of photos is the benchwork and track for the portion of the Corning Industrial's yard along the back wall - around the curve to the right in the photo below.  The only part remaining to be constructed was the second peninsula.  This is what the yard throat area looked like at the point at which doubts set in and eventually the plan changed.

19. 3/19/06 Corning Industrial yard

Even though I was very exciting about the new plan, it was a horrible feeling to rip up track and remove benchwork.  Especially given my glacial construction pace.  But it had to be done.  This photo shows the same corner as the above photo, with a lot of track removed and the benchwork around the corner removed.  The following photo shows the homabed being scrapped up.

20. 7/4/07 Demise of the Corning Industrial, converting to a shortline.
21. 7/6/07 Scrapping up lots of homabed.
Old stuff removed, ready to make progress on the shortline.  The horrible feeling went away at this point, replaced by enthusiasm for the new plan.  You can see the remnants of the curved yard homabed.  The heavy pencil lines are the new track alignment.

22. 7/6/07 Starting on new track.

The new switch for Cains is in in this photo.  I like the new Cains alignment much better than the old one.  Also note that the team track siding had the homabed tapered down to plywood level, to make it a bit lower than the main track.

23. 12/2/07 Main track in.




24. 4/5/11 Feeders ready to solder to new track.

Rather than show the current state of the No-Name at the tail end of this already too long post, I'll follow up with another post with current photos.

Monday, January 2, 2012

Update on NO-OX

The No-Name Industrial Park is back in business!  After the NO-OX distaster I spent a LOT of time cleaning track using various solvents and techniques.  I got small improvements in traction, but nowhere near what was needed.  Frustration lead to basically ignoring the layout for a few months.  And that turned out to be just what was needed!  A few days ago I decided to spend a vacation day cleaning track again to try to get the layout operational.  But first I did some test running.  It turns out that I can now shove 8 of the Atlas 60' Berwick hi-cubes around the curve and up the short grade into the Tighe track with only minimal slipping as long as I keep it moving - if I let the speed drop below a scale 4 mph (easy to check since I've speed calibrated my loco for 1 speed step per scale mph in 28 speed step mode) then slipping takes over and it gets stuck.  Apparently some of whatever was making the track slippery has either evaporated, or gotten stickier, or something.  That's good enough to resume operating the layout.  And I can hold out hope that time will continue to improve the situation.

Saturday, November 19, 2011

Palmer Industrial Fascia

I mentioned at the end of my Foam on the Palmer Industrial Park post that I was planning on following the recommendation in Lance Mindheim's book "How To Build A Switching Layout" to use 1/4" MDF for fascia.  The bending experiment I showed at the end of that post was a success.  Here's a photo of that piece of MDF after I unclamped it and left it sitting on the bench for a couple weeks:

The bend holds even when unclamped
 You can see that the bend has relaxed a little bit, but not much.  Success!  I bought a sheet of 1/4" MDF to do the rest of the fascia.  I promptly broke two strips trying to put both bends in a single piece for the end of the peninsula.  Sanity prevailed while I still had enough left of the sheet.  I went back to my original method of doing just one bend at a time.  I used a trash can lid, sitting on a piece of 2" foam with a hole cut in it for the handle, so the lid would sit flat.  I filled the lid with water, and soaked an old towel in it.  Then I wrapped the towel around the section of an MDF strip that needed to be bent.  I propped the ends of the MDF up a bit to give it just a little bend, and left the towel wrapped area sitting on the trash can lid with the water deep enough to keep the towel soaking.


Heavily soaking at the beginning of a bend
The water needed to be refilled as it soaked in.  And pouring it over the top of the towel made sure the whole towel wrapped area stayed soaking.  Over the course of several hours, I propped up the ends higher and higher, wedging them in a little too to keep increasing the bend.  It's very important not to rush this process, or the MDF will break.  As the bend progressed the towel wrapped section sat further down in the water in the trash can lid, which made keeping it soaking easier.


The bend is progressing nicely
Once the MDF will bend to the desired radius without much force, it's time to go clamp it on the layout.  I did each bend in a separate piece.  Some planning as to where the joints in the MDF will be is necessary, so you can get the bend in about the right place with enough extra at each end so you can trim to fit.  It does take a little time to do, but it's kind of fun and I think the end result is worth it.


I fastened the MDF to the layout with yellow glue and brads.  At the joints between pieces of MDF I just made sure both ends were cut square, butted them up, and glued them like crazy.  After all the glue dried I went back and filled in the imperfections at the joints with wood filler, and sanded it flush.  It didn't take much.  The dark color of the fascia hides any remaining imperfections.  The joints between the MDF sections have a 1x4 behind them below the plywood surface, which helps keep them firmly aligned.  The top 2 1/4" is unattached though - all that's behind it is the 2" foam.  The rigidity of the MDF combined with it's solidly glued base seems to make the top end of the joints between strips plenty strong enough, even though they are just butted together and glued.


Fascia in place and painted
Above is a picture of the end of the Palmer Industrial Park peninsula with the fascia installed and painted gloss hunter green.  I painted the layout supports satin black too, which was a big improvement.  I used valspar latex enamel paint - the color, finish, and brand were selected by what was available at the local Lowes pre-mixed in a quart can.  The colors turned out pretty nicely.  The green is a pretty dark color, and it doesn't seem to be possible to get a picture of it that really shows it's color properly - it looks darker than the above picture in person.  I used forest green on the O scale layout (in the background), and in person that doesn't look as nice as the hunter green.

The paper track plan, cut back to not overhang the edges, did a good job of keeping the green fascia paint off the layout surface.  After the fascia paint was dry I pulled off the paper track plan for good.  The most recent thing I've done is finish going over the rows of indentations in the foam left by the pounce wheel track plan tracing so the track center lines are easily visible.  We lost power for four days in an early but nasty storm here.  It eventually occured to me that since the best way to go over the rows of indentations is to shine a flashlight along the layout surface, it was a task perfectly suited to a cold and dull evening with no power.

Fascia done, backdrop done, trackplan traced - time for track?
The current state of the layout is shown in the photo above.  It's now time to quit waffling on some final track decisions.  When I started this project I planned to hand lay code 40 turnouts and use ME code 40 flex track.  I eventually convinced myself that if I ever wanted to actually get the layout running I should use Atlas code 55.  I've purchased all the Atlas code 55 track and switches I need, but I must admit there has been a little nagging voice in the back of my head saying "it's still not too late to do code 40".  I also need to finalize a decision on how to control the turnouts (ground throw, just plain friction, tortoise, something more exotic), and practice soldering point jumpers to those tiny little points a bit more on my two sacrificial practice turnouts.

Up to now, all of those seemed like decisions I could string along until the time came.  The time has now come.

Sunday, November 13, 2011

Aeronautical Distractions

Model railroading has been my main hobby for as long as I can remember, if not longer.  But I do have other hobbies, and occasionally one of them occupies enough time to be a serious distraction from railroading.  Recently that's been the case with radio controlled airplanes.  Specifically, small (about 15 inch wingspan) battery powered electric RC planes.


The aeronautical distractions, bottom to top in order of preference
Of the six micro rc airplanes I've had, five are still flyable and are shown in the above photo.  Micro in this case means they all have a wingspan in the range of about 15 inches.  First was the Parkzone Vapor (center in photo).  With 3 channel control (throttle, rudder and elevator), it makes a good beginner plane.  Very rugged too.  Second was a Parkzone Cessna, a little faster but still 3 channel.  It's not in the above photo, because it had a terminal encounter with a tree.  Third was the Parkzone Sukhoi (top plane in photo), the first micro rc plane with ailerons on the market.  It's "twitchy", and was too much for my abilities at the time.  Ailerons allow for more variety in crashing - cartwheeling turned out to be a specialty.  I got overwhelmed, shelved it and stopped flying for a while.  The fourth plane I got is the Parkzone P-51 (second from top in photo).  Also a 4 channel plane (throttle, rudder, elevator, and ailerons).  It's not twitchy like the Sukhoi.  I learned a lot with it until a tree jumped in front of it and bent the prop shaft.  While waiting for a replacement I bought the T-28.

The bottom two planes in the above photo are my favorites.  The Parkzone micro T-28 (second from bottom), and an E-flite micro Beast (bottom).  The T-28 is a very fun plane to fly.  It's very well behaved, yet still pretty maneuverable - loops, rolls, and other stunts are pretty easy.  Relaxing and fun.  It also has the distinction of being the only micro RC plane I haven't crashed (if you don't count a few bad landings).  The Beast is, well, a beast.  It's the only plane in the bunch to have a brushless motor and a 2 cell (7.4 volt) lipo battery - the others are all single cell.  It's got very large control surfaces.  It goes fast, can turn on a dime, and can roll fast enough so you loose orientation (i.e. you think it's rightside up when it's upside down).  It does exactly what you tell it to do, and has no self correcting tendencies (if you let go of the controls it won't level out).  It can get into a lot of trouble very fast.  If you look closely you'll see the that left top wing has been broken off right at the inside corner of the aileron.  The bottom wing has been broken twice.  The guy wires have been popped off a couple times.  The nose has been mushed in once.  Medium thickness foam safe CA with a kicker can work wonders.  But the wing does have a slight twist to it now that messes up some maneuvers.  It's still in good enough shape to teach me a few more things though.  It is most definitely NOT relaxing to fly (at least at my current skill level), but it is a lot of fun.

To tie this back into model railroading, you'll notice the planes are sitting on the benchwork of the N scale Palmer Industrial Park - in fact they're sitting on Trans Plastics.  That photo was taken after I finished installing and painting the fascia (the subject of the next post I'll write), but before I finished tracing the pounce wheel dents in the foam with black magic marker to make the track plan more visible.

Now that the weather is colder and the wind seems to insist on being too gusty to fly these little planes when it's still light enough to see them, perhaps I'll get back to some more model railroading.

Tuesday, September 6, 2011

Palmer Industrial Backdrop

The backdrop for the Palmer Industrial Park goes down the middle of the layout, which sticks out into the middle of the room.  I didn't want the backdrop to change the feel of the room from one big open space into a sort of maze.  So I decided to keep the top a bit below my eye level.  A nice convenient height seemed to work out to 10 inches above the foam.  That seems like it should be quite high enough to provide a good backdrop for relatively flat N scale scenes - none of my buildings will be anywhere near 10 inches tall, and even tall trees won't quite make it to the top (10 inches is 133 N scale feet).

I described the backdrop supports in Foam on the Palmer Industrial Park.

Order of operations is always a good debate.  I wanted to get the foam painted a reasonable earth color, the backdrop painted sky blue, and the fascia painted dark green.  It seemed to me that the best way to do that and have the least potential for getting a color of paint somewhere it shouldn't be was to do things in this order:
  1. Paint the foam.
  2. Tape down the paper track plan, to transfer it to the foam and then to use it as a drop cloth to keep backdrop and fascia paint off the foam.
  3. Put up the backdrop and paint it.
  4. Put up the fascia and paint it.
  5. Rip off the now paint splattered, pounce wheel punctured paper plan and stand back to admire it all.
Without backdrop or fascia to worry about, painting the foam is fast and easy.

Foam painted a light tan
I used a color from TrueValue called "Benefactor" (number 14D4).  It's not quite what I hoped it would be, but it serves the purpose of being at least somewhat ground colored, and still light enough to easily see pencil and marker lines on.

With the foam painted, getting the paper plan back down over the backdrop supports turned out to be fairly easy, with only a bit of fiddling around to get it positioned properly again.

Track plan back over painted foam
As I mentioned previously I decided to try a roll of vinyl flashing for the backdrop, so I wouldn't have any seams.  The flashing is fairly thin, which is why I used sheets of plywood to support it.  The open question was what glue to fasten it with.  I didn't want to have to try to clamp the vinyl in place while the glue dried.  I wasn't sure I could do it without denting the vinyl.  And I didn't have any clamps with long enough reach anyway.  So I read the fine print on the the tubes of glue in the glue aisle.  After rejecting the ones that had dire warnings about ventilation, I found Loctite Power Grab for tub surrounds.  The fine print says it has "very high initial tack which reduces the need to brace".  I clamped a plywood scrap vertically to a support column in the basement, spread some of the stuff on it, pressed on a chunk of vinyl, and sure enough it stayed put.  After it dried, I couldn't see anywhere that the glue had damaged the vinyl.  And I couldn't pull the vinyl off without exerting enough force to wreck the vinyl anyway.  So I bought another tube (and later discovered I should have bought two more tubes), and started on the real backdrop.

Glue spread into thin layer on support
I used a plastic scrapper to spread the beads of glue out into a more or less solid thin coating on the plywood backdrop supports.  Then very carefully press the vinyl into it.  You can pull the vinyl back off, and even slide it around a little to get it exactly where you want.  The only really tricky bit for my backdrop was the bulb around the end.  I used an extra thin bead of glue up the single post at the end, and let the curve of the vinyl do most of the work, pulling it around until it just squished into the glue bead on the end vertical a bit.  Here's the backdrop completely glued on, with the remainder of the roll sitting on the O scale layout at the far end, waiting for the glue to dry.

Backdrop glued in place
At the far end the backdrop curves out to the wall with a pretty tight radius.  I didn't actually glue the backdrop to the wall, I slipped a sheet of thin (1/16 or so) model aircraft plywood I had lying around in and glued the backdrop to that.  Saves messing up the wall.

Once the glue was dry, I trimmed off the remainder of the vinyl roll and applied the first coat of paint.
First coat of paint
I used valspar EB6-4 Sky Blue.  I chose the one color actually labelled "sky blue" after bringing home hundreds of those paint sample strips with exotic names for various shades of light blue.  I'm very happy with it.  I'd always thought the backdrop on my O scale layout was a bit to intense of a blue, this one seems much better.  In the above photo you can see a couple blue marks on the track plan, so it is serving it's new purpose as a drop cloth.



So, if I was to do the backdrop over, I'd make a continuous strip of plywood down the center, cutting a series of vertical saw kerfs deep into it where the shallow curves are to make the bends.  But I'd do the big blob at the end the same way.

Monday, September 5, 2011

Transfering the Plan

On both my new N scale Palmer Industrial Park and my older O scale No-Name Industrial Park I drew the trackplan in a cad program (Ashlar Vellum, for reasons I won't bore you with here).  The cad drawing has very accurate turnout locations with point, frog, and center lines marked, and also easements.  The challenge then becomes getting the drawing onto the layout in a form that helps you lay track.  I described the process of getting the full size printout in Mocking up the Palmer Industrial Park.

Once you've got the full size plan taped down to the layout (and in the case of foam, if you're going to paint the foam paint it before you get to this stage) you can transfer the plan from the paper to the layout.  I use a pounce wheel, which is a sharp pointy wheel in a handle.  You can get cheap ones at fabric stores, but they don't have the sharpness necessary to do a good job.  I bought the 3-piece pounce wheel set from Micro-Mark, and I mostly use the largest of the three wheels.

Using the pounce wheel is simple.  Try it out on a scrap with however many paper thicknesses you have to see how much pressure you need to get a good line of dents.  It needs a lot more pressure on plywood than it does on foam.

Using the pounce wheel
At intervals while you're doing the pounce wheeling, take a break (your hand will need it anyway), and very carefully peek under the paper without moving it to make sure you're getting a good line of dents - not too deep, and not too faint.

Once your done, make sure you've got decent lines of dents everywhere.  For laying track, you want the line to be clearly visible between ties and through a thin layer of glue, so you need to go over the dents with a pencil or permanent marker.  If there are places where the dents get a bit faint (it happens), shining a flashlight along the line will bring them out.

A flashlight makes tracing dents easy
A bit of care and patience, and the cad drawing is transferred very accurately to the roadbed.

I've done all the pounce wheeling on the Palmer Industrial Park, but I haven't yet done all the tracing.  The printed plan is now serving as a drop cloth to keep backdrop and fascia paint off the foam, after which it will be discarded and I'll finish the tracing.

I should note that an alternate approach I've seen used on the North Shore Model Railroad club layout's newer areas is to simply glue the printed track plan to the plywood, and glue the roadbed and track to the plan.